Cooper Facilities Updates Spring 2023
- Eight new PODS installed on 6th floor.
- Red fabric sliding doors installed on the study cubbies.
- Two new study rooms at the back of 4th floor east side.
- New Glasbau Hahn exhibit cases were installed in Cooper lobby on 4th floor (photos) and the first exhibit launched “60th anniversary of Integration.