Cooper Facilities Updates Spring 2023

  • Eight new PODS installed on 6th floor.
  • Red fabric sliding doors installed on the study cubbies.
  • Two new study rooms at the back of 4th floor east side.
  • New Glasbau Hahn exhibit cases were installed in Cooper lobby on 4th floor (photos) and the first exhibit launched “60th anniversary of Integration.